LDT Validation Plan and Report Template
Short answer: An LDT validation plan sets the test's intended use, studies, samples and acceptance criteria before data collection. The validation report compares results against those criteria and records the laboratory director's approval. CLIA requires all of it to be documented (42 CFR 493.1253(c)) and kept while the test is in use, for at least 2 years.
Last reviewed: November 10, 2026. Primary sources: 42 CFR 493.1253(c), 493.1105(a)(3)(i), 493.1251, 493.1445(e)(3) and CAP COM.40000.
Validation plan outline
- Test identification: name, analyte(s), method, instrument(s), software and versions.
- Intended use: specimen types, collection devices, patient population, clinical purpose, qualitative or quantitative output.
- Regulatory path: LDT or modified FDA test under 493.1253(b)(2); state approvals needed (e.g., New York).
- Studies and designs: accuracy, precision, analytical sensitivity, analytical specificity and interference, reportable range, reference interval, specimen stability, carry-over or other method-specific characteristics.
- Samples: source, number, matrix, concentration levels, contrived samples and why the number is adequate.
- Acceptance criteria for each study, set before testing.
- Statistics to be used.
- Personnel and training for staff running the studies.
- Approvals: plan approved by the laboratory director or qualified designee before work starts.
Validation report outline
- Summary and conclusion: does the test meet every acceptance criterion?
- Results for each study, with raw data referenced and deviations explained.
- Discrepancy investigation and resolution.
- Established performance specifications: the numbers you will claim and give clients on request (493.1291(e)).
- Calibration and QC procedures derived from the data (493.1253(b)(3)).
- Limitations, including interfering substances.
- Reportable range, reference interval and report wording, including the LDT statement (disclaimer).
- Director review, signature and date approving clinical use before patient testing (CAP COM.40000; 493.1445(e)(3)).
Template sections mapped to requirements
| Section | Requirement |
|---|---|
| Each performance characteristic | 493.1253(b)(2)(i)–(vii) |
| Calibration and QC plan | 493.1253(b)(3); 493.1256 |
| Documentation of all activities | 493.1253(c) |
| Record retention: life of the test system, at least 2 years | 493.1105(a)(3)(i) |
| Director ensures verification procedures are adequate | 493.1445(e)(3)(ii) |
| Written evaluation of each component signed by the director before clinical use | CAP COM.40000 |
| Procedure manual entry approved, signed and dated by the current director before use | 493.1251(d) |
| LDT list kept current | CAP COM.40200 |
Building or fixing an LDT? We help labs plan validation studies, write the plan and report, and prepare for CLIA, CAP and state review.
Procedure manual elements the validation feeds
42 CFR 493.1251(b) requires, when applicable: specimen requirements and rejection criteria; step-by-step procedure and calculations; reagent, calibrator and control preparation; calibration and calibration verification; the reportable range as established; control procedures; corrective actions; limitations including interfering substances; reference intervals; critical values; literature references; reporting system; and what to do if the system fails.
Public templates worth using
The APHL Verification and Validation Toolkit includes a process checklist and, in its qualitative section, NGS method validation plan and summary report templates. CMS's Verification of Performance Specifications brochure covers the verification side. See also our method verification summary template.
How Sound Lab Consultants helps
- Write the validation plan with defensible acceptance criteria
- Turn raw data into a director-ready report
- Align the SOP, QC plan and report wording with the validation
Talk through your test with a lab regulatory consultant.
Frequently asked questions
What should an LDT validation plan include?
Intended use, regulatory path, each study design, samples and numbers, acceptance criteria set in advance, statistics, personnel, and director approval before testing begins.
Who signs an LDT validation report?
The laboratory director or a qualified designee. CAP COM.40000 requires a signed evaluation approving each nonwaived test before patient use, and 42 CFR 493.1251(d) requires the director to approve, sign and date procedures before use.
How long must LDT validation records be kept?
For as long as the lab uses the test system, but no less than 2 years, under 42 CFR 493.1105(a)(3)(i).
Is there a free LDT validation template?
APHL's Verification and Validation Toolkit publishes checklists and NGS validation plan and summary templates. The outline on this page maps each section to the CLIA rule it satisfies.
Sources
- 42 CFR 493.1253
- 42 CFR 493.1105
- 42 CFR 493.1251
- 42 CFR 493.1445
- 42 CFR 493.1291
- 42 CFR 493.1256
- CAP Test Method Validation and Verification excerpt (PDF)
- APHL Verification and Validation Toolkit
- CMS: Verification of Performance Specifications (PDF)
Sound Lab Consultants is an independent consulting firm. It is not affiliated with, endorsed by or acting for CMS, CDC, FDA, the College of American Pathologists, the New York State Department of Health or any accrediting organization or Medicare contractor. This page is general regulatory information, not legal advice. Confirm current requirements with the agency or accreditor that oversees your laboratory. Sound Lab Consultants, 25 Arizona Pl, Chandler, AZ 85225.
