When to Revalidate a Laboratory Developed Test
Short answer: An LDT needs new validation work when a change could affect accuracy, precision, sensitivity, specificity or reportable range, such as a new reagent source, a new specimen type, a protocol step change, a new instrument or relocation. CMS guidance treats such changes as modifications under 42 CFR 493.1253(b)(2); scope the study to what the change could affect.
Last reviewed: November 10, 2026. Primary sources: SOM Appendix C, 42 CFR 493.1253, 493.1255 and CAP COM.40100/40800.
Changes and what they require
| Change | What to do | Source |
|---|---|---|
| Protocol change: incubation time or temperature, dilution, procedural step, endpoint or cutoff calculation | Establish affected performance specifications before use | SOM Appendix C (modification examples) |
| Different calibrator or reference material, or changed set-points | Establish affected specifications | SOM Appendix C |
| Different antibody, detector, substrate, solid phase or antigen strain | Establish affected specifications | SOM Appendix C |
| Reagents changed to another manufacturer's | Reverification is required | SOM Appendix C |
| New specimen type, matrix or collection device | Establish for the new matrix | Specimen guide |
| Additional instrument, even the same make and model | Verify or establish for each instrument | SOM Appendix C |
| Relocation of the lab or test system; loaner instrument | Confirm performance is not affected | SOM Appendix C |
| Complete reagent change, major maintenance, critical part replaced, unresolved QC shift | Calibration verification | 493.1255(b)(3) |
| Test taken out of production and restarted | CAP: PT or alternative assessment and performance verification within 30 days before restart; competency within 12 months | CAP COM.40100 |
| Software or pipeline version change (NGS) | Revalidate affected steps | Pipeline validation |
Sizing the revalidation
CLIA does not prescribe a partial revalidation protocol. A practical approach is a documented risk assessment: list which characteristics the change could plausibly affect, repeat those studies, and record the director's rationale for anything not repeated. CMS lets labs use the manufacturer's lower limit after a modification only if they show the lower limit is unaffected, which shows the logic: demonstrate, do not assume (SOM).
Building or fixing an LDT? We help labs plan validation studies, write the plan and report, and prepare for CLIA, CAP and state review.
Tell clients and update records
- Give clients pertinent updates “whenever changes occur that affect the test results or interpretation” (493.1291(e)); CAP COM.40800 requires explaining significant methodology changes.
- Re-evaluate reference intervals after a methodology change (CAP COM.50100).
- Update the procedure, signed and dated by the director before use, and keep the old version with its discontinuation date (493.1251(d)–(e)).
- Keep revalidation records with the original validation for the life of the test (493.1105(a)(3)(i)).
See LDT quality management and change control.
How Sound Lab Consultants helps
- Set up change control that flags revalidation triggers
- Scope and run partial revalidations
- Write client notifications for method changes
Talk through your test with a lab regulatory consultant.
Frequently asked questions
Do I need to revalidate an LDT after a reagent lot change?
A new lot of the same reagent is usually handled through lot-to-lot checks and calibration verification when 493.1255(b)(3)(i) applies. Switching to another manufacturer's reagent requires reverification under CMS guidance.
Does a second identical instrument need validation?
Yes. CMS guidance says that when multiple instruments, including the same make and model, perform the same test, the lab must verify or establish performance specifications for each.
What if we move the lab?
CMS says each lab must determine that its performance specifications are not affected by relocation of the lab or test system.
What does CAP require when restarting a seasonal test?
CAP COM.40100 requires PT or alternative assessment and verification of performance specifications within 30 days before restarting, and competency assessed within the prior 12 months.
Must clients be told about method changes?
Yes. 42 CFR 493.1291(e) requires updates when changes affect results or interpretation, and CAP COM.40800 requires explaining significant changes.
Sources
- CMS SOM Appendix C (PDF)
- 42 CFR 493.1253
- 42 CFR 493.1255
- 42 CFR 493.1291
- 42 CFR 493.1251
- 42 CFR 493.1105
- CAP Test Method Validation and Verification excerpt (PDF)
Sound Lab Consultants is an independent consulting firm. It is not affiliated with, endorsed by or acting for CMS, CDC, FDA, the College of American Pathologists, the New York State Department of Health or any accrediting organization or Medicare contractor. This page is general regulatory information, not legal advice. Confirm current requirements with the agency or accreditor that oversees your laboratory. Sound Lab Consultants, 25 Arizona Pl, Chandler, AZ 85225.