When to Revalidate a Laboratory Developed Test

Short answer: An LDT needs new validation work when a change could affect accuracy, precision, sensitivity, specificity or reportable range, such as a new reagent source, a new specimen type, a protocol step change, a new instrument or relocation. CMS guidance treats such changes as modifications under 42 CFR 493.1253(b)(2); scope the study to what the change could affect.

Last reviewed: November 10, 2026. Primary sources: SOM Appendix C, 42 CFR 493.1253, 493.1255 and CAP COM.40100/40800.

Book a free consultation

Changes and what they require

ChangeWhat to doSource
Protocol change: incubation time or temperature, dilution, procedural step, endpoint or cutoff calculationEstablish affected performance specifications before useSOM Appendix C (modification examples)
Different calibrator or reference material, or changed set-pointsEstablish affected specificationsSOM Appendix C
Different antibody, detector, substrate, solid phase or antigen strainEstablish affected specificationsSOM Appendix C
Reagents changed to another manufacturer'sReverification is requiredSOM Appendix C
New specimen type, matrix or collection deviceEstablish for the new matrixSpecimen guide
Additional instrument, even the same make and modelVerify or establish for each instrumentSOM Appendix C
Relocation of the lab or test system; loaner instrumentConfirm performance is not affectedSOM Appendix C
Complete reagent change, major maintenance, critical part replaced, unresolved QC shiftCalibration verification493.1255(b)(3)
Test taken out of production and restartedCAP: PT or alternative assessment and performance verification within 30 days before restart; competency within 12 monthsCAP COM.40100
Software or pipeline version change (NGS)Revalidate affected stepsPipeline validation

Sizing the revalidation

CLIA does not prescribe a partial revalidation protocol. A practical approach is a documented risk assessment: list which characteristics the change could plausibly affect, repeat those studies, and record the director's rationale for anything not repeated. CMS lets labs use the manufacturer's lower limit after a modification only if they show the lower limit is unaffected, which shows the logic: demonstrate, do not assume (SOM).

Building or fixing an LDT? We help labs plan validation studies, write the plan and report, and prepare for CLIA, CAP and state review.

Book a free consultation

Tell clients and update records

  • Give clients pertinent updates “whenever changes occur that affect the test results or interpretation” (493.1291(e)); CAP COM.40800 requires explaining significant methodology changes.
  • Re-evaluate reference intervals after a methodology change (CAP COM.50100).
  • Update the procedure, signed and dated by the director before use, and keep the old version with its discontinuation date (493.1251(d)–(e)).
  • Keep revalidation records with the original validation for the life of the test (493.1105(a)(3)(i)).

See LDT quality management and change control.

How Sound Lab Consultants helps

  • Set up change control that flags revalidation triggers
  • Scope and run partial revalidations
  • Write client notifications for method changes

Talk through your test with a lab regulatory consultant.

Book a free consultation

Frequently asked questions

Do I need to revalidate an LDT after a reagent lot change?

A new lot of the same reagent is usually handled through lot-to-lot checks and calibration verification when 493.1255(b)(3)(i) applies. Switching to another manufacturer's reagent requires reverification under CMS guidance.

Does a second identical instrument need validation?

Yes. CMS guidance says that when multiple instruments, including the same make and model, perform the same test, the lab must verify or establish performance specifications for each.

What if we move the lab?

CMS says each lab must determine that its performance specifications are not affected by relocation of the lab or test system.

What does CAP require when restarting a seasonal test?

CAP COM.40100 requires PT or alternative assessment and verification of performance specifications within 30 days before restarting, and competency assessed within the prior 12 months.

Must clients be told about method changes?

Yes. 42 CFR 493.1291(e) requires updates when changes affect results or interpretation, and CAP COM.40800 requires explaining significant changes.

Sources

Sound Lab Consultants is an independent consulting firm. It is not affiliated with, endorsed by or acting for CMS, CDC, FDA, the College of American Pathologists, the New York State Department of Health or any accrediting organization or Medicare contractor. This page is general regulatory information, not legal advice. Confirm current requirements with the agency or accreditor that oversees your laboratory. Sound Lab Consultants, 25 Arizona Pl, Chandler, AZ 85225.

Sound Lab Consultants Logo

Clinical Lab Growth & Compliance Experts helping labs launch, scale, and pass inspections with confidence.

📧 sales@soundlabconsult.com

📍 Headquarters: 25 Arizona Pl, Chandler, AZ 85225
Serving laboratories nationwide in all 50 states

Services

  • CLIA, COLA & CAP Consulting
  • Lab Startup & Buildout
  • Inspection Preparation
  • Lab Billing & Revenue Cycle
  • Staff Training & Compliance

Get Started

Ready to build or scale your lab?

Schedule a Consultation

Trusted by labs nationwide

© 2026 Sound Lab Consultants. All rights reserved.