To prepare for a CLIA survey, confirm your CLIA certificate and test menu match, then review QC and IQCP, the procedure manual, calibration and maintenance records, PT results and corrective action, personnel qualifications and competency, and facility safety against 42 CFR Part 493. Run a mock inspection using CMS SOM Appendix C, fix gaps with evidence, and have records organized for the surveyor.

Last reviewed: Oct 31, 2026

Book a free consultation

Specimen tubes in a rack on a laboratory bench

Who does CLIA surveys

For labs with a Certificate of Compliance, CMS or the state survey agency conducts the inspection under 42 CFR Part 493 Subpart Q. Under 493.1777, the initial inspection happens before a Certificate of Compliance is issued and subsequent inspections may occur on a biennial basis. Labs with a Certificate of Accreditation are inspected by their accreditor, and CMS may also do validation surveys.

Step-by-step CLIA survey preparation

  1. Confirm the certificate type, director and test menu on file with CMS match current practice.
  2. Review QC and any IQCP under 493.1256 and SOM Appendix C.
  3. Review the procedure manual for completeness and director approval (493.1251).
  4. Check maintenance and function checks (493.1254) and calibration and calibration verification (493.1255).
  5. Review every PT event and its corrective action (493.1236).
  6. Confirm personnel qualifications and competency assessments (493.1235 and the personnel subpart for your complexity).
  7. Review quality assessment records (493.1239, 493.1289).
  8. Walk the facility for safety and storage (493.1101).
  9. Run a mock inspection and close gaps on a dated work plan.

Timeline

Start with the areas that need the most lead time. Missing calibration verification or competency assessments take time to complete properly, while organizing binders does not.

WhenTask
EarlyMock inspection and gap list
MiddleClose gaps: procedures, QC reviews, PT reviews, competency, calibration
Final weeksRe-check closed items; organize records by area; brief staff
Survey dayRecords on request (493.1773); note all observations
Clipboard checklist for CLIA survey preparation

What to expect on survey day

SOM Appendix C describes the survey process, which includes an entrance discussion, a tour of the testing areas, review of records, observation of testing and staff interviews, and an exit discussion of findings. Deficiencies are listed on the CMS-2567, and the lab responds with a plan of correction.

Records to have ready

  • Certificate, accreditation letters and the current test menu.
  • QC data, QC review records and IQCP documents for each test system (493.1256).
  • Procedure manual with director approvals, and retired procedures (493.1251, 493.1105).
  • Maintenance, function check, calibration and calibration verification records (493.1254, 493.1255).
  • PT enrollment, results, reviews and corrective actions (493.1236).
  • Personnel qualification files and competency assessments (493.1235).
  • Quality assessment reviews and corrective action records (493.1239, 493.1282, 493.1289).
  • Safety plans and training records (29 CFR 1910.1030, 1910.1450).

Keep them organized by area so any record can be produced when asked, as 42 CFR 493.1773 requires. Retention periods are set by 493.1105, and many records must be kept at least two years.

Common CLIA survey deficiencies to check first

  • Procedures not approved by the current director.
  • QC not reviewed or out-of-range QC without corrective action.
  • PT results not reviewed or not investigated.
  • Calibration verification missed.
  • Competency assessment incomplete.
  • Testing outside the certificate type.

See also CLIA inspection deficiencies.

How SLC helps

Sound Lab Consultants works with labs on CLIA survey preparation, mock inspections and plans of correction. See Lab Survey Preparation and What Surveyors Check on a CLIA Survey.

Frequently asked questions

How often are CLIA surveys done?

42 CFR 493.1777 allows subsequent inspections on a biennial basis or at another frequency CMS sets. Source: eCFR 42 CFR § 493.1777.

What does a CLIA surveyor use as a guide?

CMS State Operations Manual Appendix C, which contains survey procedures and interpretive guidelines for 42 CFR Part 493. Source: CMS State Operations Manual Appendix C - Survey Procedures and Interpretive Guidelines for Laboratories (PDF).

Can a lab refuse a CLIA inspection?

42 CFR 493.1773 requires the lab to permit CMS or its agent to inspect, and refusal can lead to sanctions. Source: eCFR 42 CFR § 493.1773, eCFR 42 CFR § 493.1816.

Are waived labs surveyed?

Certificate of Waiver labs are not routinely surveyed, but CMS may inspect them, for example on complaint or under its waived lab project, per Subpart Q. Source: eCFR 42 CFR Part 493 Subpart Q - Inspection.

Sources

Related pages

Sound Lab Consultants, 25 Arizona Pl, Chandler, AZ 85225.

Book a free consultation

How to Prepare for a CLIA Survey

Sound Lab Consultants Logo

Clinical Lab Growth & Compliance Experts helping labs launch, scale, and pass inspections with confidence.

📧 sales@soundlabconsult.com

📍 Headquarters: 25 Arizona Pl, Chandler, AZ 85225
Serving laboratories nationwide in all 50 states

Services

  • CLIA, COLA & CAP Consulting
  • Lab Startup & Buildout
  • Inspection Preparation
  • Lab Billing & Revenue Cycle
  • Staff Training & Compliance

Get Started

Ready to build or scale your lab?

Schedule a Consultation

Trusted by labs nationwide

© 2026 Sound Lab Consultants. All rights reserved.