Updated Oct 30, 2026 - Sound Lab Consultants CLIA team - General information, not legal advice

CMS-2567 Plan of Correction: Deadlines, Required Elements and Format

A CMS-2567 plan of correction (PoC) is the written response a provider, supplier or CLIA laboratory returns for each deficiency cited on Form CMS-2567, the Statement of Deficiencies and Plan of Correction. Under the CMS State Operations Manual (SOM), it is due within 10 calendar days of receiving the form, must be signed and dated on page 1 of the CMS-2567, and the form itself is publicly releasable within 14 days after the provider or lab receives it.

This guide explains every part of that process with links to the official CMS, eCFR and SOM sources. It covers CLIA laboratories in detail and shows where the long-term care (nursing home) rules differ. For a shorter, lab-only walkthrough of writing each response, see our companion page, How to write a CLIA plan of correction.

Book a free consultation

Gloved hands using a pipette in a clinical laboratory

On this page

  • What Form CMS-2567 is
  • Key facts at a glance
  • Deadline: 10 calendar days
  • Public release: 14 days (QSO-25-19-ALL)
  • Signature and date requirements
  • Required PoC elements: CLIA labs
  • Required PoC elements: nursing homes and other providers
  • CLIA vs long-term care: side-by-side
  • S&C 17-34: PoC formatting
  • Allegation of compliance and credible allegation
  • Standard-level vs condition-level deficiencies
  • Timelines when sanctions apply (Subpart R)
  • Sample PoC row layout
  • Pre-submission checklist
  • Why a PoC is sent back
  • FAQ

What is Form CMS-2567?

Form CMS-2567, Statement of Deficiencies and Plan of Correction, is the official CMS form on which a State Survey Agency (SA) or CMS records the deficiencies found during a survey, and on which the surveyed entity records its plan of correction. CMS lists it as form CMS 2567 (OMB 0938-0391) on its CMS forms page.

State Survey Agencies perform initial surveys, recertification surveys and complaint investigations of Medicare-certified providers and suppliers, and of CLIA-certified laboratories. The findings from those surveys are documented on the CMS-2567 (QSO-25-19-ALL).

SOM Chapter 2, section 2728, describes the form's functions (SOM Chapter 2):

  • It is the basic document disclosed to the public about the entity's deficiencies and what is being done to remedy them.
  • It documents the specific deficiencies cited.
  • It documents the provider's or supplier's plans for correction and timeframes.
  • It gives the provider an opportunity to refute survey findings and furnish documentation that requirements are met.

Each citation on the left side of the form includes a prefix and data tag number, the regulatory reference and requirement that is not met, and the evidence supporting the deficiency (SOM Chapter 2, section 2728A). In a CLIA laboratory survey the tags are D-tags, for example D5400 for Analytic Systems. Our CLIA D-tag guide explains how to read them.

Surveyors identify what is not met, not how to fix it. SOM Chapter 6 states that it is the laboratory's responsibility to determine the corrective action(s) necessary to remedy the problem(s) (SOM Chapter 6).

Key facts at a glance

TopicRuleOfficial source
When the SA sends the CMS-2567 to a CLIA labWithin 10 working days of completing the surveySOM Ch. 6, §6132
CLIA PoC or credible AoC due10 calendar days after receipt of the CMS-2567SOM Ch. 6, §6132
Non-LTC providers and suppliers PoC due10 calendar daysSOM Ch. 2, §2728
Nursing home PoC dueWithin 10 calendar days from the date the facility receives its CMS-2567SOM Ch. 7, §7317; 42 CFR 488.402(d)
Public release of the CMS-2567Within 14 days after receipt by the provider, supplier or lab; can be released immediately upon receiptQSO-25-19-ALL (June 18, 2025)
Release of the PoC/AoCReleasable upon approval by CMSQSO-25-19-ALL
SignatureLab director or provider/supplier representative signs page 1 of the CMS-2567S&C 17-34-ALL
PoC formatOn the right side of the form or as a separate attachmentS&C 17-34-ALL
CLIA standard-level correction limitWithin 12 months after the last day of inspection42 CFR 493.1816; SOM Ch. 6, §6132.2
CLIA response to a proposed sanctionAt least 10 days, as stated in the notice42 CFR 493.1810(a)(6)

How long do you have to submit a CMS-2567 plan of correction?

The standard deadline is 10 calendar days from the date you receive the CMS-2567. That timeframe appears in the SOM for CLIA laboratories, for non-long-term-care providers and suppliers, and for nursing homes. Your cover letter controls, so use the date in your own letter.

CLIA laboratories

SOM Chapter 6, section 6132 (Rev. 230, issued July 11, 2025) says the SA sends the laboratory a copy of the CMS-2567 within 10 working days of completing the survey. If there are citations, the SA allows the laboratory 10 calendar days to complete and return a PoC or credible allegation of compliance (AoC) after receipt of the form. If immediate jeopardy is identified, the SA follows the timeframes in section 6284 instead (SOM Chapter 6).

At the exit conference, the survey team is to tell the lab that the official findings will be forwarded in writing on the CMS-2567 within 10 working days, and that the lab is to return the PoC or credible AoC in 10 calendar days of receiving it (SOM Chapter 6).

If the laboratory director asks for more time, SOM Chapter 6, section 6132.2, says the SA explains that a preliminary PoC must still be submitted within 10 days, as precisely as present information permits, and may be followed with a more specific plan as early as possible. A revisit or contact to verify correction occurs only when the lab makes an acceptable PoC.

Nursing homes (long-term care)

SOM Chapter 7, section 7317 (Rev. 244, issued June 26, 2026) states that a plan of correction must be submitted within 10 calendar days from the date the facility receives its CMS-2567. If an acceptable PoC is not received in that time, the State notifies the facility that it is recommending remedies be imposed. The PoC requirement is at 42 CFR 488.402(d), and section 7317 notes that 42 CFR 488.456 requires termination of the provider agreement of a facility that does not submit an acceptable PoC (SOM Chapter 7). A nursing home's request for informal dispute resolution must be made within the same 10-calendar-day period (SOM Chapter 7).

Other providers and suppliers

SOM Chapter 2, section 2728, says the SA mails the provider or supplier a copy of the CMS-2567 within 10 working days after the survey, and if there are deficiencies, allows 10 calendar days to complete and return the PoC. The "reasonable period of time" to achieve compliance is generally no longer than 60 calendar days, though specific dates may be shorter or longer depending on the deficiency (SOM Chapter 2, §2728B; 42 CFR 488.28).

When is the CMS-2567 released to the public?

Under CMS memo QSO-25-19-ALL, dated June 18, 2025, the CMS-2567 is publicly releasable within 14 days after receipt by the provider, supplier or lab, which means it can be released immediately upon receipt. The memo is posted on the CMS policy memo page with a PDF copy.

  • What changed: CMS's previous practice held public release of the CMS-2567 for up to 90 days after the survey was completed, or until a PoC or AoC was approved by the SA or CMS location.
  • Why: the memo says none of those actions justify a delay in releasing health and safety information.
  • What did not change: CMS states it is not changing the provider or supplier's review window. Facilities and labs generally still have ten days to respond through the PoC or AoC process.
  • Nursing homes: the update aligns other providers with the nursing home process, under which CMS-2567s are releasable within 14 days of transmission to the facility by regulation (42 CFR 488.325).
  • The PoC itself: in accordance with Admin Info-24-14-All, the PoC or AoC is releasable upon approval by CMS. If CMS cannot approve it and conducts a revisit instead, there is no PoC/AoC to release.
  • Accrediting organizations: the guidance does not apply to accrediting organization survey findings, except those for hospices and home health agencies.

Practical effect for a lab: the findings may be public before your plan is written or approved. Because the CMS-2567 and the accompanying PoC/AoC are publicly releasable, S&C 17-34 requires providers and labs to omit Privacy Act information and protected health information from the PoC. SOM Chapter 6 also says a lab may never allude to another laboratory or malign an individual on a publicly disclosable CMS-2567.

Who signs the CMS-2567, and where?

The laboratory director, or the provider or supplier representative, must sign the first page of the CMS-2567. The PoC or AoC can be attached to that signed first page (S&C 17-34-ALL).

  • CLIA labs: the laboratory director or other authorized official (owner, operator and/or laboratory director) must sign and date the CMS-2567 on which the lab's PoC is written (SOM Chapter 6, §6132.2). The SA's review checks for the signature of the laboratory director or designee (§6134).
  • Other providers and suppliers: the PoC must be signed and dated by the administrator or other authorized official (SOM Chapter 2, §2728B). Changes to a PoC must also be signed by the provider or supplier (§2728E).
  • Nursing homes: the PoC must be signed by a facility representative, who should be the administrator; others may include the director of nursing or a corporate representative with management authority and responsibility. Some SAs use an electronic PoC (ePOC) with an electronically generated signature (SOM Chapter 7, §7317).

Date the signature. The date shows when the plan was submitted and is what the agency uses to judge timeliness against the 10-calendar-day window.

What are the required elements of a CLIA plan of correction?

For CLIA laboratories, SOM Chapter 6, section 6132.2, lists four elements that must be submitted with a PoC, and the plan must also give realistic completion dates within 12 months of the survey (SOM Chapter 6). The four elements are:

  1. Corrective action for affected patients: documentation describing the corrective actions taken for patients identified by the survey and subsequent analysis as affected by the deficient practice.
  2. Identification of other affected patients: an explanation of how the laboratory has identified other patients who may have been affected by the deficient practice.
  3. Systemic change: a description of the corrections and/or systemic changes put in place so the deficient practice does not recur.
  4. Monitoring: a description of how the corrective actions are monitored to ensure the deficient practice does not recur.

Section 6132.2 adds that not every deficiency must be corrected when the PoC is submitted, but correction dates must fall within 12 months after the "date survey completed" on the CMS-2567 and must be reasonable in timeframe and content. The plan must be specific, with stated, realistic timeframes. Because a PoC is a plan for standard-level deficiencies, it may contain future dates.

When the SA reviews a lab's PoC or AoC (SOM Chapter 6, §6134), it checks appropriateness, legibility, completeness and timeliness, and verifies five things: the four elements above plus the signature of the laboratory director or designee.

Completion dates and the responsible person

The CLIA list in Chapter 6 does not name a "responsible person" element. The SOM Chapter 2 list that S&C 17-34 quotes does require the title of the person responsible for implementing the plan, and S&C 17-34 says all of its listed elements are expected in an acceptable PoC or credible AoC, including for CLIA labs, no matter the format (S&C 17-34). Naming a responsible position title in each CLIA response meets both lists. Use a title, such as technical consultant or general supervisor, rather than a personal name, since the form is public.

Every response also needs a completion date. For CLIA standard-level deficiencies the outside limit is 12 months after the last day of inspection (42 CFR 493.1816), but the agency must find the dates reasonable for the specific deficiency.

What are the required elements for nursing homes and other providers?

For non-long-term-care providers and suppliers, SOM Chapter 2, section 2728B, says an acceptable plan of correction must contain four elements (SOM Chapter 2):

  1. The plan of correcting the specific deficiency, addressing the processes that led to the deficiency cited.
  2. The procedure for implementing the plan for the specific deficiency cited.
  3. The monitoring procedure to make sure the plan is effective and the deficiency remains corrected.
  4. The title of the person responsible for implementing the plan.

For nursing homes, SOM Chapter 7, section 7317, says an acceptable plan of correction must (SOM Chapter 7):

  1. Address how corrective action will be accomplished for residents found to have been affected by the deficient practice.
  2. Address how the facility will identify other residents with the potential to be affected by the same deficient practice.
  3. Address what measures will be put into place or systemic changes made so the deficient practice will not recur.
  4. Indicate how the facility plans to monitor its performance to make sure solutions are sustained.
  5. Include dates when corrective action will be completed, which must be acceptable to the State.

These five nursing home elements are where the phrase "five required elements of a PoC" usually comes from. A CLIA lab answers the same four substantive questions about patients instead of residents, and the completion date is required separately.

CLIA labs vs long-term care: side-by-side

ItemCLIA laboratoryNursing home (LTC)
Manual chapterSOM Chapter 6 (§6132-6134)SOM Chapter 7 (§7317)
Response due10 calendar days after receipt10 calendar days from receipt
Standard-level responsePlan of correction; future dates allowedPlan of correction, which serves as the facility’s allegation of compliance
Condition-level responseAllegation of compliance; no future correction dates for the condition and the standards within itCredible allegation of compliance before a revisit
Who is affectedPatients and patient resultsResidents
SignerLaboratory director or authorized official (owner, operator)Facility representative, normally the administrator
Correction limit12 months after last day of inspection (42 CFR 493.1816)Dates acceptable to the State; remedies under 42 CFR 488 Subpart F
Enforcement rules42 CFR 493 Subpart R42 CFR 488 Subpart F
Public release of the 2567Within 14 days of receipt (QSO-25-19-ALL)Within 14 days of transmission (42 CFR 488.325)

What did S&C 17-34 change about PoC formatting?

S&C 17-34-ALL, issued June 16, 2017, lets providers, suppliers and CLIA laboratories submit their PoC (and, for CLIA, their AoC) as a separate attachment instead of writing it in the right-hand column of the CMS-2567. They may still write it on the form (S&C 17-34-ALL).

  • The signature of the laboratory director or provider/supplier representative is still required on the first page of the CMS-2567. The attachment goes with that signed first page.
  • All required elements are expected in an acceptable PoC or credible AoC, no matter the format.
  • Privacy Act information and protected health information must be left out. If included, the SA notifies the provider or lab and obtains an amended PoC.
  • Long-term care facilities must post the most recent CMS-2567 and any PoC in effect under 42 CFR 483.10(g). If a facility attaches its PoC to the first page, it must post the PoC with the publicly available form.

A separate attachment is easier to organize when several tags share evidence. Label each response with its D-tag (or F-tag) so the reviewer can match it to the citation.

What is an allegation of compliance, and what makes it credible?

For CLIA labs, an allegation of compliance (AoC) is requested when condition-level noncompliance is found. It is the lab's assertion that it is already in compliance, so no future correction dates are acceptable for any condition-level deficiency or for the standard-level deficiencies included in that condition (SOM Chapter 6, §6132.3). Standard-level deficiencies outside the condition may still carry future dates.

An AoC must contain the same four elements as a PoC. In addition, it must be a statement or documentation that is:

  1. Made by a representative of a laboratory with a history of having maintained a commitment to compliance and taking corrective action when required;
  2. Realistic in terms of the possibility of the corrective action being accomplished between the date of the survey and the date of the allegation; and
  3. Indicates resolution of the problem(s).

This mirrors the definition of credible allegation of compliance in 42 CFR 493.2. Support it with records: corrected reports, look-back lists, revised procedures, training and competency sign-offs, QC and PT data. Our allegation of compliance guide and evidence of correction guide cover what to attach.

For nursing homes, the PoC serves as the facility's allegation of compliance in non-immediate-jeopardy cases, and compliance must still be verified before substantial compliance is certified or remedies are lifted (SOM Chapter 7, §7317 and §7317.1). SOM Chapter 2 notes that for SNFs and NFs a credible allegation of compliance is required before a revisit.

Standard-level vs condition-level deficiencies

CLIA requirements in 42 CFR Part 493 are organized into conditions and the standards beneath them. A standard-level deficiency means a specific requirement is not met. A condition-level deficiency means the noncompliance is serious enough that the whole condition is not met, which opens the enforcement procedures in 42 CFR 493 Subpart R. See CLIA condition-level deficiencies and sanctions for detail.

  • Standard level: the lab must submit a PoC acceptable to CMS in content and timeframes. If a revisit finds the deficiencies not corrected within 12 months after the last day of inspection, CMS cancels Medicare payment approval and notifies the lab of its intent to suspend, limit or revoke the certificate, with hearing rights (§493.1816).
  • Condition level, no immediate jeopardy: CMS may cancel Medicare payment approval, suspend, limit or revoke the certificate, or impose alternative sanctions (§493.1814).
  • Immediate jeopardy: CMS requires the lab to take immediate action to remove the jeopardy and may impose alternative sanctions (§493.1812).

Under SOM Chapter 6, section 6134.1, a lab that resubmits the same PoC or AoC it used the last time a repeat deficiency was cited has not submitted an acceptable plan, and labs are not to be given multiple opportunities to correct repeat deficiencies. Our page on ability to sustain corrections discusses that finding.

Timelines when CLIA sanctions apply (42 CFR 493 Subpart R)

StepTimelineRegulation
Notice of condition-level noncompliance and proposed sanctionLab is given at least 10 days to respond§493.1810(a)(6)
Notice of imposition of an alternative sanction, immediate jeopardyAt least 5 days before the effective date§493.1810(c)(2)(i)
Notice of imposition of an alternative sanction, no immediate jeopardyAt least 15 days before the effective date§493.1810(c)(2)(ii)
Immediate jeopardy not eliminated on revisitCertificate suspended or limited no earlier than 5 days after notice§493.1812(b)
Condition-level deficiencies not correctedMedicare payment approval cancelled if not corrected within 12 months after the last day of inspection§493.1814(b)
Standard-level deficiencies not corrected12 months after the last day of inspection§493.1816(b)
Revised PoC for remaining standard-level deficienciesMay not extend beyond 12 months from the last day of the inspection§493.1820(d)

Alternative sanctions include a directed plan of correction (§493.1832), state onsite monitoring and civil money penalties (§493.1806). An alternative sanction continues until deficiencies are corrected or CMS takes a principal sanction, among other endpoints in §493.1810(d). Appeal rights are in §493.1844; follow the deadlines in your notice letter.

Sample PoC row layout

Whether you write on the form or attach a document (allowed by S&C 17-34), one row per tag keeps every required element visible. The example below is illustrative only and is not a real survey finding.

FieldExample entry (illustrative)
Tag and regulationD5400 Analytic Systems, 42 CFR 493.1250
Deficiency (summary)Patient results were reported on days one control level was out of range, with no documented corrective action.
1. Corrective action for affected patientsResults from the affected runs were reviewed; corrected reports were issued and ordering providers notified on [date].
2. Identifying other affected patientsQC records for all analytes were reviewed back to [date]; [n] additional runs were identified and handled the same way. Look-back list attached.
3. Systemic changeQC procedure revised so patient results are held until QC is acceptable; LIS rule added; all testing personnel trained on [date].
4. MonitoringGeneral supervisor reviews QC daily; technical consultant reviews QC and corrective action logs monthly for [period] and reports to the laboratory director.
Responsible person (title)Technical consultant
Completion date[date]
Evidence attachedLook-back list, corrected reports, revised SOP, training records, completed QC logs

For lab corrective action records that feed this table, see laboratory corrective action (CAPA) and the corrective action form.

Pre-submission checklist

  • Every tag on the CMS-2567 has its own response, labeled with the tag number.
  • Each response covers affected patients or results, how others were identified, the systemic change and monitoring.
  • Each response names a responsible position title, not a personal name.
  • Each response has a specific completion date; CLIA dates fall within 12 months of the survey completion date.
  • Condition-level tags (and the standards within them) are written as corrected, with no future dates, and evidence is attached.
  • Repeat deficiencies show a different, stronger plan than the last time.
  • No patient names, resident names, PHI or Privacy Act information.
  • No reference to another laboratory or provider and nothing that maligns an individual.
  • Page 1 of the CMS-2567 signed and dated by the laboratory director or authorized official.
  • Submitted within 10 calendar days of receipt, or by the date in your letter.
  • A copy of everything kept, along with the agency's acceptance.

Why does an agency send a plan of correction back?

The SOM describes these situations in which a PoC or AoC is not accepted or must be amended:

  • It is missing an element, is incomplete, illegible or late; the SA contacts the lab for clarification or modification (SOM Ch. 6, §6134; Ch. 2, §2728C).
  • Correction dates are beyond 12 months for CLIA, or are not reasonable in timeframe and content (SOM Ch. 6, §6132.2).
  • A condition-level AoC uses future dates, or is not realistic or does not show resolution (SOM Ch. 6, §6132.3).
  • For a repeat deficiency, the plan is the same one submitted before (SOM Ch. 6, §6134.1).
  • It includes PHI or Privacy Act information (S&C 17-34).
  • It alludes to another laboratory or provider, or maligns an individual (SOM Ch. 6, §6132.2; Ch. 2, §2728B).
  • It argues the seriousness of a deficiency; the agency considers evidence about whether a deficiency exists, not the surveyor's judgment of level, scope or severity (SOM Ch. 2, §2728B).

If you disagree with a citation, SOM Chapter 6 says the lab should put its protest in writing in a form suitable for disclosure, but must still provide its plan and timeframe for correction.

How SLC helps with a CMS-2567

Sound Lab Consultants works with CLIA laboratories after state agency, CMS validation, CAP, COLA and Joint Commission surveys. We review each tag, run the look-back, draft the PoC or allegation of compliance with every required element, and assemble the evidence. If the lab needs director oversight during correction, see CLIA laboratory director services. Before the next survey, a CLIA mock inspection tests the corrections.

Book a free consultation

Frequently asked questions

How many days do you have to submit a CMS-2567 plan of correction?

10 calendar days from receipt of the CMS-2567 under the SOM (Chapter 6, §6132 for CLIA labs; Chapter 2, §2728; Chapter 7, §7317 for nursing homes). Follow the date in your own cover letter.

Is the CMS-2567 public before the plan of correction is approved?

Yes. Under QSO-25-19-ALL (June 18, 2025) the CMS-2567 is publicly releasable within 14 days after the provider, supplier or lab receives it, and can be released immediately upon receipt. The PoC or AoC is releasable once CMS approves it.

Who signs a CMS-2567 plan of correction for a CLIA lab?

The laboratory director or another authorized official (owner, operator and/or laboratory director) signs and dates page 1 of the CMS-2567 (S&C 17-34; SOM Chapter 6, §6132.2).

What are the five required elements of a plan of correction?

For nursing homes, SOM Chapter 7, §7317 lists: corrective action for affected residents, how others at risk are identified, systemic changes, monitoring, and completion dates. CLIA labs submit four elements under SOM Chapter 6, §6132.2 (affected patients, others affected, systemic change, monitoring) plus realistic completion dates.

Can the plan of correction be a separate document?

Yes. S&C 17-34-ALL allows the PoC or AoC as a separate attachment to the signed first page of the CMS-2567.

What is the difference between a PoC and an AoC for a CLIA lab?

A PoC answers standard-level deficiencies and may include future dates. An AoC is requested for condition-level noncompliance and asserts the lab is already in compliance, so no future dates are acceptable for the condition or its included standards (SOM Chapter 6, §6132.3).

What if I need more time to write the plan?

For CLIA labs, SOM Chapter 6 says a preliminary PoC must still be submitted within 10 days, as precisely as present information permits, followed by a more specific plan as early as possible.

How long does a CLIA lab have to correct standard-level deficiencies?

Correction must occur within 12 months after the last day of inspection (42 CFR 493.1816), and the dates must be reasonable for each deficiency.

Sources: CMS Form 2567; SOM Chapter 6, Rev. 230 (§6132, 6132.2, 6132.3, 6134, 6134.1); SOM Chapter 2 (§2728); SOM Chapter 7, Rev. 244 (§7317); QSO-25-19-ALL; S&C 17-34-ALL; 42 CFR 493 Subpart R; 42 CFR 493.2; 42 CFR 488.402; 42 CFR 488.325.

Related SLC pages: How to write a CLIA plan of correction, Allegation of compliance, Evidence of correction, Condition-level sanctions, CLIA D-tags, Inspection deficiencies.

Have a CMS-2567 on your desk and a deadline coming up?

Book a free consultation

Sound Lab Consultants - PO Box 2135, Chandler, AZ 85244

Sound Lab Consultants Logo

Clinical Lab Growth & Compliance Experts helping labs launch, scale, and pass inspections with confidence.

📧 sales@soundlabconsult.com

📍 Headquarters: 25 Arizona Pl, Chandler, AZ 85225
Serving laboratories nationwide in all 50 states

Services

  • CLIA, COLA & CAP Consulting
  • Lab Startup & Buildout
  • Inspection Preparation
  • Lab Billing & Revenue Cycle
  • Staff Training & Compliance

Get Started

Ready to build or scale your lab?

Schedule a Consultation

Trusted by labs nationwide

© 2026 Sound Lab Consultants. All rights reserved.