An Individualized Quality Control Plan (IQCP) lets a CLIA lab use a QC approach other than the default two levels each day, if a documented risk assessment supports it. Historical QC data from Unity Real Time and peer comparison from Unity Interlab or Unity Next are strong evidence for that risk assessment and for the ongoing quality assessment, but they are inputs to the plan, not the plan itself.
Sound Lab Consultants (SLC) is an independent lab compliance consulting firm that writes and reviews IQCPs. We are not affiliated with Bio-Rad. This page explains how QC software data fits into an IQCP; it does not describe a Bio-Rad product feature for IQCP.

IQCP in brief
42 CFR 493.1256(d) sets the default: for quantitative tests, two control materials of different concentrations at least once each day patient specimens are tested, unless CMS approves an equivalent procedure in the State Operations Manual. IQCP is that CMS-approved alternative. CMS's IQCP workbook describes three parts:
- Risk assessment covering the specimen, test system, reagent, environment and testing personnel.
- Quality control plan that states the QC the lab will perform, how often, and other controls on risk.
- Quality assessment that monitors whether the plan is working and updates it when it is not.
Which tests and specialties are eligible for IQCP, and how QC frequency relates to manufacturer instructions, are set out in CMS's official IQCP guidance. Check that guidance and your accreditor's rules before starting. Our IQCP eligibility page covers the limits.
Why QC software data is useful for IQCP
The weakest IQCPs we review are built on general statements: "the analyzer has internal checks, so risk is low." The strongest rest on the lab's own evidence. A lab that has used Unity Real Time for a while already holds much of that evidence:
- Imprecision history. Months of control data give a realistic CV for each level and lot.
- Rule violation history. How often each rule fired, and why, shows the actual failure modes of the test system.
- Action logs. Recorded causes of failures map directly onto the five risk components: a reconstitution error is a personnel or reagent risk, a lamp failure is a test system risk.
- Peer bias. SDI and bias against a peer group, from monthly reports or InstantQC, show whether the method has a persistent bias the plan should address.
- Lot behavior. How each new control and reagent lot performed in crossover shows whether lot changes are a real risk for this test.
Pull this data for the test system, summarize it, and cite it in the risk assessment. A short table of failure causes over a defined period is far more convincing than a narrative.
Mapping Unity data to the risk assessment
For each of the five risk components, ask what could go wrong, how likely it is, how harmful it would be, and what controls are in place. Unity data answers the likelihood question for many of them:
- Specimen. QC data says little about specimen risks. Use other records: rejection logs, hemolysis rates, collection errors.
- Test system. Rule violations traced to instrument causes, calibration failures and maintenance-related shifts.
- Reagent. Failures linked to reagent lot changes, onboard stability or storage problems, and the crossover performance of new lots.
- Environment. Shifts that coincide with temperature, humidity or power events, if they were recorded in the action log.
- Testing personnel. Failures traced to handling, reconstitution or data entry, and differences between operators if your data shows them.
Where QC data shows a risk is real, the QC plan should include a control for it. Where the data shows a risk has never happened, you can say so, with the period covered.
An illustrative example
Consider a hypothetical chemistry analyzer where the lab wants an IQCP for an analyte that the manufacturer allows to be controlled less often than daily. The figures below are invented for illustration only and are not benchmarks.
The lab exports several months of Unity Real Time data for the analyte and summarizes it in a table: rule violations by month, each linked to the cause recorded in the action log. The summary shows that most rejections traced to two causes, control reconstitution errors on night shift and reagent packs used past onboard stability. Peer reports over the same period show a small, stable bias well inside the lab's trigger.
The risk assessment then writes itself more honestly. Testing personnel and reagent risks are real and documented; test system risk appears low for this period. The QC plan responds directly: a reconstitution competency check for night staff, an onboard stability label at the reagent load point, controls run at the frequency the manufacturer requires plus after each reagent pack change, and a monthly review of rule violations. The quality assessment section commits to comparing each month's violation count with the baseline and reviewing peer SDI quarterly.
Nothing in that plan came from a template. It came from the lab's own data, which is what makes it defensible.
Writing the QC plan
The QC plan turns the risk assessment into rules staff can follow. When Unity is part of the QC process, the plan should state:
- Which control materials are used, including the Bio-Rad product and levels, and how often each is run.
- Which SPC rules apply in Unity Real Time and whether each warns or rejects, consistent with your Westgard rule selection.
- How new control lots are introduced, per your lot change and crossover procedure.
- What other controls are relied on, such as instrument internal checks, calibration verification, operator training and specimen checks.
- What triggers corrective action, and how it is documented under 42 CFR 493.1282.
- Who reviews QC and peer reports, and how often.
The lab director signs and dates the plan, which must be in place before it is used.
Quality assessment: keep watching
An IQCP is not finished when it is signed. The quality assessment part asks the lab to monitor whether the plan is working. Unity data is ideal for this ongoing check:
- Track rule violations per month for the test and compare with the period used in the risk assessment.
- Review peer SDI trends at a set interval.
- Check corrective action causes for any new failure mode not covered by the plan.
- Look at PT results for the analyte.
- Record the review, the conclusion and any changes to the plan.
If failures rise or a new failure mode appears, update the risk assessment and plan. CMS guidance expects IQCP to be reassessed when there are changes, such as a new reagent formulation, instrument, or a change in test use. Our IQCP quality assessment review page goes into more detail.
Multiple instruments and sites
An IQCP is written for a test system in a defined setting. If the same test runs on several instruments or at several sites, decide whether one IQCP covers all of them or each needs its own. Differences in staffing, environment, volume and specimen flow often justify separate risk assessments even when the analyzer model is the same. Unity data for each instrument makes that decision easier, because you can compare failure rates and causes side by side instead of assuming they are equal. The IQCP for new tests at multiple sites page discusses this in more depth.
Common IQCP problems with QC data
- Data period not stated, so the reader cannot tell how much history supports the conclusions.
- Failure causes summarized as "QC out" with no breakdown.
- Peer data cited but not dated or attached.
- QC plan frequency that does not match the Unity schedule staff actually follow.
- Quality assessment reviews that say "no issues" without showing the data reviewed.
- Plans not updated after an instrument change or new control product.
Records to keep with the IQCP
File the IQCP with its supporting evidence so a surveyor can follow it: the data extract and summary table with the date range, the peer reports cited, the manufacturer instructions that set the minimum QC, the director-signed plan, and each quality assessment review with its conclusion. Keep superseded versions with their dates of use, as you would for any procedure under 42 CFR 493.1251.
How SLC helps with IQCP
SLC writes IQCPs from the ground up and reviews existing ones. For labs with Unity data, we help you extract and summarize QC history, map failure causes to the five risk components, write the QC plan and set up a quality assessment schedule that uses the data you already collect. See our IQCP consulting and IQCP risk assessment pages, and the Bio-Rad Unity QC consulting hub for the rest of this series.
Frequently asked questions
Does Bio-Rad Unity create an IQCP?
We are not aware of Unity documentation describing an IQCP builder; check with Bio-Rad. Either way, the lab writes the IQCP. Unity data is evidence that supports the risk assessment and quality assessment.
Can an IQCP reduce QC below the manufacturer's instructions?
No. CMS IQCP guidance says QC must be at least what the manufacturer requires. IQCP can justify a frequency different from the CLIA default of two levels each day, within that limit.
How much QC history do I need for an IQCP?
CLIA does not set a period. Use enough history to show typical performance and failure modes, state the period in the risk assessment, and explain why it is enough.
What are the five IQCP risk components?
CMS lists specimen, test system, reagent, environment and testing personnel. The risk assessment should address each one for the test system.
Can peer reports be part of IQCP quality assessment?
Yes. Peer SDI and bias trends are a practical way to monitor whether the test system is performing as the plan assumes. Date and file the reports you rely on.
When must an IQCP be updated?
When the quality assessment shows the plan is not controlling risk, or when something changes, such as a new instrument, reagent formulation, control product or test use.
Can one IQCP cover several analyzers?
It can if the risk assessment shows the instruments, settings and staff are comparable. If failure rates or conditions differ, separate risk assessments are usually more defensible.
Sources: 42 CFR 493.1256; 42 CFR 493.1282; 42 CFR 493.1239 General laboratory systems quality assessment; CMS IQCP workbook (PDF); QCNet help: InstantQC Reports; Bio-Rad Unity Interlaboratory Program (PDF); Unity Real Time 2 User Guide (PDF).
Related SLC pages: IQCP consulting, IQCP risk assessment, IQCP eligibility, IQCP quality assessment review, IQCP template, Bio-Rad Unity QC consulting.
Want an IQCP that rests on your own QC data?
Bio-Rad, Unity, Unity Real Time, UnityWeb, Unity Next, QCNet, InstantQC, Westgard Advisor, EQAS, Lyphochek, Liquichek and InteliQ are trademarks of Bio-Rad Laboratories, Inc. Sound Lab Consultants is an independent consulting firm and is not affiliated with or endorsed by Bio-Rad. Product details on this page come from Bio-Rad's public pages and user documentation, linked below; confirm current features with Bio-Rad. This page is general information, not legal advice.
Sound Lab Consultants · 25 Arizona Pl, Chandler, AZ 85225